Scope:
Based on functional requirement of an Inter Turbine Duct component, the partner is expected to provide codes , optimisation strategies and mechanical simulation tools for the design of such a component as well as to characterize the chosen material and to provide qualified parts for engine demonstrator testing. Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1 Version 3 (see under the tab "Topic Conditions and Documents")