Engine Installation Optimization

Inicio / Programas UE / H2020 / JTI-CS2-2014-CFP01-ENG-04-04
Logo

(JTI-CS2-2014-CFP01-ENG-04-04) - ENGINE INSTALLATION OPTIMIZATION

Programme: Horizon 2020 Framework Programme
Call: Clean Sky 2 Call for Proposals 01 EU

Topic description

Scope:

Aircraft Installation optimisation studies in order to improve the global powerplant performance (cooling optimisation, compactness and drag reduction, and global weight savings).  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")

Keywords

AMP Advanced Manufacturing Processes & Technologie EPG Electrical Power Generation & Distribution SAD Structural Analysis and Design

Tags

Weight reduction Cooling Drag reduction Engine Installation optimisation

Non atopas a financiación que precisas?

Contacta con nos e cóntanos cal é o teu proxecto.